• image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image

PROJECT DESCRIPTION

MARASSI SIDI ABD EL RAHMAN 220/22 KV  Main Switch Gear Building

PROJECT DETAIL

  • Project: MARASSI SIDI ABD EL RAHMAN 220/22 KV  Main Switch Gear Building
  • Owner: EMAAR MISR
  • Consultant: Shaker Consultancy Group
  • Main Contractor: EL-KHARAFI National for infrsatracture Project